JCF Bridge & Concrete

Railroad & Bridge Construction

Main menu

Menu
  • Railroad Structures
  • Civil Structures
    • Bridge Types
  • Services
    • Preconstruction Service
    • Design-Build
    • General Contract
    • Sub Contract
    • Consult
    • Bridge Management Program
  • Portfolio
    • Constructors
    • Design Build
    • FRA Bridge Compliance
    • All Bridges
    • Railroad Bridges
    • Timber Bridges
    • Vehicle Bridges
    • Pedestrian Bridges
    • Pile Driving
    • Drainage
    • Retaining Walls
    • Sheet Piling
  • About JCF
    • Upcoming Events
    • Latest News
    • Our Mission
    • Safety
    • Associations
    • Testimonials
    • Where We Work
    • Contact
  • Contact

Bridgeport Trail Bridge

bridgeport-225 bridgeport-co bridgeport-w-train
[Show picture list]
Project:Bridgeport Trail Bridge
Owner:BLM
Location:Grand Junction, Colorado
Date:20051201
Delivery Method:Contract

Scope of Work:

Construct deep foundations for and erect 225’ clear span prefabricated bridge across the Gunnison river. The bridge was to replace a condemned suspension bridge that had served as access to the Little Dominquez Canyon recreation area. A temporary embankment was constructed 90 feet into the river for crane pad to deliver equipment and materials to the otherwise non accessible far side of the river. The steel truss bridge was fabricated by Big R Manufacturing of Greeley, Colorado.

This entry was posted in . Bookmark the permalink.
  • Railroad Structures
  • Heavy Civil Structures
  • About JCF
  • Services
  • Latest News
  • Contact

JCF BRIDGE & CONCRETE, INC.
1300B East Gatlin Creek Road
Driftwood, TX 78619

Toll-Free: 877.810.1300
Phone: 512.858.5668

Copyright ©2026 JCF BRIDGE & CONCRETE, INC. | Privacy Policy
Proudly powered by WordPress | Theme: pkd by Peter King Design.