JCF Bridge & Concrete

Railroad & Bridge Construction

Main menu

Menu
  • Railroad Structures
  • Civil Structures
    • Bridge Types
  • Services
    • Preconstruction Service
    • Design-Build
    • General Contract
    • Sub Contract
    • Consult
    • Bridge Management Program
  • Portfolio
    • Constructors
    • Design Build
    • FRA Bridge Compliance
    • All Bridges
    • Railroad Bridges
    • Timber Bridges
    • Vehicle Bridges
    • Pedestrian Bridges
    • Pile Driving
    • Drainage
    • Retaining Walls
    • Sheet Piling
  • About JCF
    • Upcoming Events
    • Latest News
    • Our Mission
    • Safety
    • Associations
    • Testimonials
    • Where We Work
    • Contact
  • Contact

Fort Polk MPDBC

fort-polk-la ret-wall-fort-polk-la
[Show picture list]
Project:Fort Polk MPDBC
Owner:US Army Corp of Engineers
General Contractor:Tug Hill Construction
Location:Fort Polk, LA
Date:20050501
Delivery Method:Sub Contract

Scope of Work:

Constructed over 1300 LF of Multiplate Arch Structures. These bridge crossings were constructed in some very difficult conditions often working below the stream beds. Plate structures were fabricated by Long Span Bridge & Culvert. We constructed over 400 LF of 12” CIP retaining wall that averaged 12’ in height. Installed over 80,000 SF of Armor Flex permanent erosion control mats, manufactured by Contech Construction products. Erected 11 40’ tall steel radio towers used for communication and visual monitoring of the training course.

This entry was posted in . Bookmark the permalink.
  • Railroad Structures
  • Heavy Civil Structures
  • About JCF
  • Services
  • Latest News
  • Contact

JCF BRIDGE & CONCRETE, INC.
1300B East Gatlin Creek Road
Driftwood, TX 78619

Toll-Free: 877.810.1300
Phone: 512.858.5668

Copyright ©2026 JCF BRIDGE & CONCRETE, INC. | Privacy Policy
Proudly powered by WordPress | Theme: pkd by Peter King Design.