JCF Bridge & Concrete

Railroad & Bridge Construction

Main menu

Menu
  • Railroad Structures
  • Civil Structures
    • Bridge Types
  • Services
    • Preconstruction Service
    • Design-Build
    • General Contract
    • Sub Contract
    • Consult
    • Bridge Management Program
  • Portfolio
    • Constructors
    • Design Build
    • FRA Bridge Compliance
    • All Bridges
    • Railroad Bridges
    • Timber Bridges
    • Vehicle Bridges
    • Pedestrian Bridges
    • Pile Driving
    • Drainage
    • Retaining Walls
    • Sheet Piling
  • About JCF
    • Upcoming Events
    • Latest News
    • Our Mission
    • Safety
    • Associations
    • Testimonials
    • Where We Work
    • Contact
  • Contact

Lewisville 36” Water Supply Line No.2

36-inch-waterline-dallas-tx lew lews_000
[Show picture list]
Project:Lewisville 36” Water Supply Line No.2
Owner:Lewisville MUD
General Contractor:SJ Louis Construction
Location:Lewisville, TX
Date:20031101
Delivery Method:Sub Contract

Scope of Work:

Constructed foundations for and erected one 155’X10’ steel prefabricated box truss bridge fabricated by Continental Bridge. This bridge carried a 36” CSC Pipe weighing 970 PLF when filled. This was a value engineered bridge solution replacing original design of a build in place bridge allowing the contractor and owner to save money and complete the project quicker. SJ Louis was able to push pipe completely across bridge in one day using a large excavator.

 

 

This entry was posted in . Bookmark the permalink.
  • Railroad Structures
  • Heavy Civil Structures
  • About JCF
  • Services
  • Latest News
  • Contact

JCF BRIDGE & CONCRETE, INC.
1300B East Gatlin Creek Road
Driftwood, TX 78619

Toll-Free: 877.810.1300
Phone: 512.858.5668

Copyright ©2026 JCF BRIDGE & CONCRETE, INC. | Privacy Policy
Proudly powered by WordPress | Theme: pkd by Peter King Design.