JCF Bridge & Concrete was recently awarded the the 2015 bridge repair project with Texas Pacifico Transportation LTD. This is our third year working with Texas Pacifico and we look forward to to supporting their compliance with there FRA 237 Bridge Maintenance Program.
Author Archives: JCF Bridge
Disaster Relief Services
Due to the widespread flooding caused by heavy rain, JCF Bridge & Concrete would like to offer our services to anyone in need of temporary access, disaster clean up and immediate bridge inspection and repair.
Our prays our with all those dealing with the struggles and loss that come with flooding and tornado’s and so is our expertise, manpower and equipment if needed.
For more information contact our office at 512.858.5668 or by email info@jcf-bridge.com
God Bless
JCF Bridge & Concrete recently completed the 2014 Bridge Repair for TRE
JCF Bridge & Concrete recently completed the 2014 bridge repair for TRE (Trinity Rail Express) Madill and DFW subdivisions.
HOTR 13.7 Bridge in San Saba, TX (COMPLETED)
Transit America Services, Inc 30 Hour shutdown over San Dieguito Bay
On March 16th, JCF Bridge & Concrete completed a cap replacement on bridge 243 for the TASI (Transit America Services, Inc) over the San Dieguito Bay during a 30 hour shutdown.
JCF Bridge & Concrete Awarded Texas Pacifico Bridge Repair Project
JCF Bridge & Concrete was recently awarded the the 2014 bridge repair project with Texas Pacifico Transportation LTD. This is our second year working with Texas Pacifico and we look forward to to supporting their compliance with there FRA 237 Bridge Maintenance Program.
HOTR 13.7 Bridge in San Saba, TX
JCF Bridge & Concrete Awarded the TRE/DART 2014 Annual Bridge Inspection
JCF Bridge & Concrete Inc. was just awarded the annual TRE/DART Bridge inspection contract and for Madill Subdivision and the DCTA.