Project: | Lewisville 36” Water Supply Line No.2 |
Owner: | Lewisville MUD |
General Contractor: | SJ Louis Construction |
Location: | Lewisville, TX |
Date: | 20031101 |
Delivery Method: | Sub Contract |
Scope of Work:
Constructed foundations for and erected one 155’X10’ steel prefabricated box truss bridge fabricated by Continental Bridge. This bridge carried a 36” CSC Pipe weighing 970 PLF when filled. This was a value engineered bridge solution replacing original design of a build in place bridge allowing the contractor and owner to save money and complete the project quicker. SJ Louis was able to push pipe completely across bridge in one day using a large excavator.